Mission Control
08:40 HSTSynthetic dataTelemetry 12/12 fresh · 15-min sampling

Good morning. Two conditions need your attention.

11.7 kW generated now · 1 critical field incident · 1 asset under review

Schematic · not to scale

Living site

Open full map →
SERVICE LANESOUTH RIDGE · KAZE VAWT ARRAYA · Kalo LoʻiTaro48%B · Makai GroveBanana44%C · Uka PatchLettuce (leafy greens)14%▲ CRITICALD · Hala CorridorCover crop57%E · Nursery BedsSeedlings37%● WATCHF · Mauka EdgeMixed vegetables52%KAZE-014.7 kWKAZE-022.6 kWKAZE-034.4 kW63%PUMP-01PUMP-02WOPS

NDara · Priority decisions

3 open incidents
under reviewINC-002

KAZE-02 below wind-adjusted expectation

2.6 kW vs 4.1 kW expected (63%) while peers track the same 7.2 m/s wind. Cause not confirmed.

Site pulse

24h · kW (instantaneous)

Generation vs expectation

KAZE-02 →
Site totalKAZE-02 observedKAZE-02 expected (synthetic model)Click to place cursor
24h · % VWC · 15-min samples

Soil moisture

Water →
Zone CZone EZone A
Audit-linked

Activity timeline

  1. 08:34
    action · proposed ACT-101
    20-min controlled run, 360 L estimated.
  2. 07:52
    incident · opened INC-001
    SENSOR-C1 moisture 14% below 20% rule threshold.
  3. 02:20
    incident · opened INC-002
    KAZE-02 output below wind-adjusted baseline.
  4. 15:40
    action · completed ACT-090
    Gateway modem power cycled; uplinks verified.
Full audit →
Since 05:40

What changed since your last visit?

ACT-101 — 20-min controlled run, 360 L estimated. (6 min ago). Then INC-001 — SENSOR-C1 moisture 14% below 20% rule threshold. (48 min ago).

Network online ≠ all devices fresh

Network & usage

GW-01Online · SNR 8 dB · 97% delivery
Fresh devices12 / 12
Generation337 kWh / 24h
Irrigation energy0.00 kWh (simulated runs)
Water applied0 L (simulated runs)
Outcomes report →

All site readings, forecasts and outcomes are synthetic. Hardware capabilities marked "assumed" are unverified.