Manage
Agent Actions & Approvals
Read-only by default. Physical actions need named supervisor approval and only ever run as a simulation.
Role: Operator (sandbox)Simulated execution only
ACT-101 · irrigation
Controlled 20-min irrigation run · Zone C
Bring Zone C soil moisture back toward its 20% rule threshold before afternoon heat.
- proposed
- awaiting approval
- approved
- queued
- running
- verifying
- completed
Before
Zone C 14% · valve closed · pump off
Proposed change
Open VALVE-C, enable PUMP-01 at 18 L/min for 20 min, then close and stop.
Forecast outcome (simulated)
360 L · 0.50 kWh · ≈+2 pts at next reading
- Origin incident
- INC-001
- Proposer
- NDara Field Agent (simulated)
- Targets
- VALVE-C, PUMP-01
- Required role
- Supervisor
- Approver
- —
- Start / window
- Now (on approval)
- Alternatives
- Wait until 05:30 tomorrow · Inspect valve and probe first
Evidence
Needs Supervisor role — switch role in the header (sandbox)
Action progress timeline
Execution events
- 08:34Submitted for supervisor approval
- 08:34Proposal drafted from INC-001 evidence
Append-only (local) · mode: simulation
Audit log
| Time | Actor | Event | Object | Status | Details |
|---|---|---|---|---|---|
| 08:34 | NDara Field Agent (simulated) | action.proposed | ACT-101 | awaiting approval | 20-min controlled run, 360 L estimated. |
| 07:52 | Rule engine | incident.opened | INC-001 | open | SENSOR-C1 moisture 14% below 20% rule threshold. |
| 02:20 | NDara Field Agent (simulated) | incident.opened | INC-002 | investigating | KAZE-02 output below wind-adjusted baseline. |
| 15:40 | K. Akana (Supervisor) | action.completed | ACT-090 | approved → completed | Gateway modem power cycled; uplinks verified. |