Figures derive from the same site state as every other view. Financial, carbon and certificate values are illustrative estimates.
kWh over 24h
Energy
| KAZE-01 | 122.1 kWh | CF 50.9% |
| KAZE-02 | 100.0 kWh | CF 41.7% |
| KAZE-03 | 115.0 kWh | CF 47.9% |
| Site total | 337.1 kWh | CF 46.8% |
KAZE-02 shortfall vs expected: 6.6 kWh (estimated).
Litres
Water
- Applied by simulated runs
- 0 L
- Irrigation pump energy
- 0.00 kWh
- Tank now
- 63.0% · 11,340 L
- Runs
- 0
Against configured bands
Crop-zone exceptions
- Zone A · Kalo Loʻi48%healthy
- Zone B · Makai Grove44%healthy
- Zone C · Uka Patch14%critical
- Zone D · Hala Corridor57%healthy
- Zone E · Nursery Beds37%watch
- Zone F · Mauka Edge52%healthy
Now
Device availability
12 / 12 field devices fresh · gateway online · 97% uplink delivery (24h, synthetic)
Proposals & outcomes
Agent interventions
- ACT-101 · Controlled 20-min irrigation run · Zone Cawaiting approval
- ACT-090 · Restart gateway backhaul modemcompleted
1 completed (simulated).
Status
Incidents
- INC-001 · Zone C (Uka Patch) is critically dryawaiting approval
- INC-002 · KAZE-02 below wind-adjusted expectationinvestigating
- INC-003 · Rain gauge 01 battery lowopen
- INC-004 · GW-01 intermittent backhaulresolved
Estimated potential avoided emissions only
Sustainability
229.3 kg CO₂e
Method: 337.1 kWh × 0.68 kg/kWh. Not a certified calculation; grid factor and baseline require independent verification. Separate from any certificate registry.
I-REC / VCU · mock statuses
Environmental attribute records
- KAZE-01..03 generation, last 24hnot evaluated
- Site generation, last 7dpotentially eligible
- Q3 aggregate (illustrative)not evaluated
No certificates are issued from raw generation data. Eligibility requires metered, verified evidence.
Included in export
Audit actions
| 08:34 | NDara Field Agent (simulated) | action.proposed | ACT-101 | 20-min controlled run, 360 L estimated. |
| 07:52 | Rule engine | incident.opened | INC-001 | SENSOR-C1 moisture 14% below 20% rule threshold. |
| 02:20 | NDara Field Agent (simulated) | incident.opened | INC-002 | KAZE-02 output below wind-adjusted baseline. |
| 15:40 | K. Akana (Supervisor) | action.completed | ACT-090 | Gateway modem power cycled; uplinks verified. |