Reports
Manage

Outcomes & Evidence

Figures derive from the same site state as every other view. Financial, carbon and certificate values are illustrative estimates.

kWh over 24h

Energy

Synthetic
KAZE-01122.1 kWhCF 50.9%
KAZE-02100.0 kWhCF 41.7%
KAZE-03115.0 kWhCF 47.9%
Site total337.1 kWhCF 46.8%

KAZE-02 shortfall vs expected: 6.6 kWh (estimated).

Litres

Water

Applied by simulated runs
0 L
Irrigation pump energy
0.00 kWh
Tank now
63.0% · 11,340 L
Runs
0
Against configured bands

Crop-zone exceptions

  • Zone A · Kalo Loʻi48%healthy
  • Zone B · Makai Grove44%healthy
  • Zone C · Uka Patch14%critical
  • Zone D · Hala Corridor57%healthy
  • Zone E · Nursery Beds37%watch
  • Zone F · Mauka Edge52%healthy
Now

Device availability

12 / 12 field devices fresh · gateway online · 97% uplink delivery (24h, synthetic)

Proposals & outcomes

Agent interventions

  • ACT-101 · Controlled 20-min irrigation run · Zone Cawaiting approval
  • ACT-090 · Restart gateway backhaul modemcompleted

1 completed (simulated).

Status

Incidents

  • INC-001 · Zone C (Uka Patch) is critically dryawaiting approval
  • INC-002 · KAZE-02 below wind-adjusted expectationinvestigating
  • INC-003 · Rain gauge 01 battery lowopen
  • INC-004 · GW-01 intermittent backhaulresolved
Estimated potential avoided emissions only

Sustainability

229.3 kg CO₂e

Method: 337.1 kWh × 0.68 kg/kWh. Not a certified calculation; grid factor and baseline require independent verification. Separate from any certificate registry.

I-REC / VCU · mock statuses

Environmental attribute records

  • KAZE-01..03 generation, last 24hnot evaluated
  • Site generation, last 7dpotentially eligible
  • Q3 aggregate (illustrative)not evaluated

No certificates are issued from raw generation data. Eligibility requires metered, verified evidence.

Included in export

Audit actions

08:34NDara Field Agent (simulated)action.proposedACT-10120-min controlled run, 360 L estimated.
07:52Rule engineincident.openedINC-001SENSOR-C1 moisture 14% below 20% rule threshold.
02:20NDara Field Agent (simulated)incident.openedINC-002KAZE-02 output below wind-adjusted baseline.
15:40K. Akana (Supervisor)action.completedACT-090Gateway modem power cycled; uplinks verified.